Aluminum Ringlock Scaffold Safety Management Objectives, Safety Responsibility Objectives May 24, 2017

First, before the start of the supervision work:

1, carefully review the construction unit of the construction organization design, Aluminum Ringlock Scaffolding safety technical measures and Aluminum Ringlock Scaffolding force calculation to review, to ensure the safety of Aluminum Ringlock Scaffolding construction, where the calculation of the book is not safe and qualified conclusions should be rework;

    2, urging the construction unit to develop safety production responsibility at all levels, safety management objectives, safety responsibility objectives and safety inspection system;

    3, the preparation of supervision programs and safety supervision rules;

    4, carefully verify the "project start safety production conditions checklist" content of the completion of the situation, fail to meet the requirements, and urge the rectification;

    5, review the number of operating personnel submitted by the construction unit and the job card is in line with the requirements.

Second, the Aluminum Ringlock Scaffolding project safety supervision control method:

    (A) safety supervision, prevention mainly:

    1, for the site site may appear security issues, to remind the construction unit to pay attention to, as far as possible before the control;

    2, the development of safety supervision and inspection system, timely inspection found that security risks, the existence of hidden dangers through the issuance of supervision engineers or timely convening of the security conference to coordinate;

    3, on time check the Aluminum Ringlock Scaffolding each section of the acceptance work, timely collection of acceptance information, material certificate, quasi permits and related information;

    4, actively cooperate with the higher authorities in the Aluminum Ringlock Scaffolding construction inspection, listen to rectification opinions, urging the construction unit to implement on schedule to eliminate the hidden dangers of accidents;

    5, the inspection is not implemented in time, should be notified in writing construction units, and credited to the supervision of the diary and supervision summary;

    6, the location of a serious accident, the problem will be ordered in time to complete the rectification of the construction unit deadline, if the construction unit on the hidden problems, delays in rectification, supervision staff will make a rectification rectification, and report the construction unit, if the construction unit of the hidden trouble, Refused to rectify the timely reporting of quality supervision station, the higher authorities in charge of serious treatment.

    (B) the handling of major accidents:

    1, after the accident, must be promptly reported to the higher authorities and the competent authorities to obtain work instructions;

    2, with the construction unit to do the protection of the scene, rescue personnel and other on-site work;

    3, to participate in the investigation of the scene of the accident, to understand the cause of the accident, process, to assist the construction unit as soon as possible to make a written investigation report, and make notes;

    4, urge the construction unit to do the rectification of the accident tracking work, found that hidden risks in a timely manner to assist the construction of administrative departments in charge of the accident after the rectification of the re-inspection work.

    Third, the Aluminum Ringlock Scaffolding supervision and control work:

    (A) Aluminum Ringlock Scaffolding material control work:

    1, according to the provisions of the provisions and construction organization design requirements of steel pipe, fasteners, Aluminum Ringlock Scaffolding and safety net inspection and acceptance, substandard products shall not be used;

    2, check the Aluminum Ringlock Scaffolding steel pipe should have quality certificate, quality inspection report and diameter, specifications, models meet the construction organization design requirements, for serious corrosion, bending, flattened or cracked steel pipe is strictly prohibited;

    3, check the new fastener should have a production license, the statutory test unit of the test report and product quality certificate, the crack before the start of the supervision work:

    1, carefully review the construction unit of the construction organization design, Aluminum Ringlock Scaffolding safety technical measures and Aluminum Ringlock Scaffolding force calculation to review, to ensure the safety of Aluminum Ringlock Scaffolding construction, where the calculation of the book is not safe and qualified conclusions should be rework;

    2, urging the construction unit to develop safety production responsibility at all levels, safety management objectives, safety responsibility objectives and safety inspection system;

    3, the preparation of supervision programs and safety supervision rules;

    4, carefully verify the "project start safety production conditions checklist" content of the completion of the situation, fail to meet the requirements, and urge the rectification;

    5, review the number of operating personnel submitted by the construction unit and the job card is in line with the requirements.

  Fourth, the safety management of Aluminum Ringlock Scaffolding:

    Construction site safety management should be in accordance with the state promulgated safety production law, construction safety management regulations and Shunde District of Foshan City and other places of the relevant provisions of the site to do a good job of the safety management:

    1, careful review of the construction unit submitted to the construction organization design safety technical measures and the special construction program is consistent with the mandatory standards for construction, the part does not meet the requirements must be returned to the construction unit to modify the construction organization design, the program is not Before approval, not allowed to start;

    2, the inspectors will be daily on the Aluminum Ringlock Scaffolding project security checks and found that security risks in a timely manner and ordered rectification;

    3, the site of all the insecurity of the hidden danger, the supervisor will notify the construction unit in writing, requiring deadline for rectification and improvement;

   4, the security risks, if the construction unit delay can not be required by the supervision notice of the rectification, or in the relevant safety hazards of the site (process) to continue to adhere to the construction, the supervisor will issue a partial process of the shutdown order, and asked for safety Hidden deadline rectification completed at the same time notify the construction unit, requiring the construction unit to help the site of the safety management;

    5, the inspectors have repeatedly pointed out that the construction unit of the security risks refused to rectification or not to stop the construction, the supervisor will be promptly reported to the local substandard substation;

    6, through the construction site regular, timely coordination of security risks in the emergence of the difficulties, points, to take effective measures to prevent unsafe accidents.